Elevation of our door


This project was our first group project which was going to be good to be able to play to every ones strengths in the group. We were given the Scrymgeour door. Which in my opinion was the hardest door. The first thing we had to do was go and measure the door because it had to be drawn at 1:1 for our final presentation.


one of the pillars





Details of the crest

Aiden then created a CAD drawing for us from our measurements so that we could plan out our door. We only had to do half our door because it was really complex. We then stuck down 12 sheets that were slightly bigger than A0 together so we could see the size of the door we had to work with. We all took a section of the drawing an designed it in any way we wanted. It was really good because we always had to work in the studio which meant we could all help eachother and make decisions together.



Final door

Group and our door


Group and door from above